{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000036639","budgetReference":"E/0904-611 - GSTP Element 1 Dev","classified":false,"closingDate":"2027-12-31T13:00:00","extensionRequestDeadline":"2027-12-17T13:00:00","clarificationRequestDeadline":"2027-12-17T13:00:00","description":"The European Space Agency (\"the Agency\" or \"ESA\") invites you to submit a Proposal under the General Support Technology Programme, Element 1: \"Preparation of enabling space technologies and building blocks''The aim is to prepare and to develop enabling capabilities and the associated building blocks for space related systems and the associated sub-systems. An additional aim is to allow the targeted and coordinated development of the capabilities and building blocks (i.e. among academia and industry) in a given ESA Member State or across different Member States (in a collaborative manner). The intended output is to provide industry with a stronger foundation (i.e. building on this acquired know-how) in order to contribute to new space related system opportunities at national or international levels (institutional, commercial...) The objective is to enable Member States to support the further development of t capabilities and the associated building blocks in their industry. The technology development activities may be prepared in a targeted and coordinated manner. The enabling capabilities and building blocks are to be developed for a targeted type and class of space systems (in terms of performance, cost, size...) and with guiding specifications. The developments are to be performed in a coordinated manner to ensure that industry is able to work on complementary capabilities. The developments may be performed within one Member State or across several Member States in a collaborative manner. The enabling capabilities and building blocks are to be developed to a level such that the industrial entities may then be able to perform developments and eventually produce for concrete/more specific space related developments. The developments may go from a proof-of-concept (via simulation or experiment) up to an engineering qualification model (EQM). They address any technical area (structures, avionics/GNC, power control and distribution...). The spefications are to be linked to the guiding system or sub-system specifications. The maximum amount per activity is 1,000 K. The maximum duration is24 months. ","ecosrequired":false,"establishment":"ESTEC","firstPublicationDate":"2023-01-26T14:50:47","id":56123,"idEra":18589,"initiatingService":"TEC-RTI","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"231","lastUpdateTime":"2026-09-16T14:26:27","lastUpdateUser":"system","openDate":"2023-03-21T14:44:21","priceRange":"KEURO","programmeReference":"GSTP Element 1 Dev","tanumber":"4-40002","title":"GSTP ELEMENT 1: DEVELOP: PREPARATION OF ENABLING SPACE TECHNOLOGIES AND BUILDING BLOCKS - STANDARD CALL FOR PROPOSAL","directorate":null,"countries":[{"id":1},{"id":62},{"id":27},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":20},{"id":19},{"id":18},{"id":17},{"id":16},{"id":15},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":8},{"id":7},{"id":6},{"id":5},{"id":2},{"id":67},{"id":168},{"id":28},{"id":4}],"products":[],"technologies":[{"id":26}],"status":{"id":2},"tenderType":{"id":7},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter."],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the CfP/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 11 of the Proposal Cover Letter);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.6 of the CfP/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.7 of the CfP/TC);","The Tenderer confirms that the Proposal Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the Proposal Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the CfP;","The Tenderer confirms that the Proposal is compliant with the budgetary limit applicable to the CfP;","The Tenderer confirms that the Proposal Cover Letter contains the confirmation of the validity period required in the subject CfP;","The Tenderer confirms that it and its Subcontractor(s) completed at least the “Light Registration” in esa-star Registration;","The Tenderer confirms that the “consortium structure” in esa-star Tendering mirrors the Proposed Team in the Proposal Cover Letter;","The Proposal contains a technical description;","The proposed work does not overlap with any previous or presently running ESA Contract awarded to any entity in the Proposed Team."],"evaluationCriterias":[{"criterion":"QUALITY OF THE TECHNICAL PART OF THE PROPOSAL.","weightingFactor":"0%"},{"criterion":"QUALITY OF THE MANAGEMENT, IMPLEMENTATION AND FINANCIAL PART OF THE PROPOSAL; COMPLIANCE WITH ADMINISTRATIVE TENDER CONDITIONS AND ACCEPTANCE OF CONTRACT CONDITIONS.","weightingFactor":"0%"}],"entities":[],"procurementProposal":null,"responsible":"Francesca Moscon","updateReason":"Tender Action Data Information Updated"}],"totalNew":0,"totalUpdated":0}