{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000047664","budgetReference":"E/0133-04Q - Post-ISS Infra E3P4","classified":false,"closingDate":"2027-01-15T13:00:00","extensionRequestDeadline":"2027-01-08T13:00:00","clarificationRequestDeadline":"2027-01-08T13:00:00","description":"At present, access to the full range of cooling and heating capabilities on the ISS relies oncold-stowage allocations provided through NASA. This dependency imposes significant constraintson ESA scientific missions, which are both highly demanding and competingfor limited resources.In preparation for the post-ISS era and future collaboration models with Commercial LEO Destination(CLD) providers, the executive has identified a strategic need to establish an autonomouscold-stowage portfolio. Such capability is essential to meet the research requirements of theEuropean scientific community and to support value-exchange mechanisms with future commercialpartners. PINGU will be a single Middeck-Locker-sized unit, offering a conditioned internal volume of up to 14 Lcapable of accommodating diverse sample geometries. The system will provide precise temperaturecontrol, with a programmable operating range from-90 C to +4 C, thereby covering the mostdemanding thermal requirements for ESA research.","ecosrequired":true,"establishment":"ESTEC","firstPublicationDate":"2026-10-27T10:44:55","id":197652,"idEra":25849,"initiatingService":"HRE-O","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"000","lastUpdateTime":"2026-11-16T11:57:21","lastUpdateUser":"tagnanap","openDate":"2026-11-16T11:57:17","priceRange":"> 500 KEURO","programmeReference":"Post-ISS Infra E3P4","tanumber":"1-13751","title":"POWERED COOLED INTEGRATED GENERAL PURPOSE STOWAGE UNIT [ PINGU ] (E4LE-016)","directorate":null,"countries":[{"id":1},{"id":168},{"id":67},{"id":62},{"id":27},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":20},{"id":19},{"id":17},{"id":15},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":8},{"id":7},{"id":6},{"id":5},{"id":2},{"id":16}],"products":[{"id":319}],"technologies":[{"id":257}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["With regard to the technical requirements of the ITT/RFQ, the tender is","With regard to the applicable Industrial Policy and Geographical return requirements, the tender is","The technical proposal is free from any plagiarism. When use is made of material being quotations or citations from existing public literature, such use is clearly indicated and due reference indications (source and author) are provided.","With regard to the financial requirements of the ITT/RFQ, the tender is","With regard to the Contract conditions of the ITT (please refer to the Draft Contract and to the Proposal Template, Section 6.1.), the tender is","With regard to the IPR requirements of the ITT (please refer to the Draft Contract and to the Proposal Template, Section 6.2), the tender is","With regard to the managerial requirements of the ITT/RFQ, the tender is","With regard to the Agency’s “Right to Audit” (see Part 2, section 2.2.8 of the ESA Tender Conditions), the tender is","With regard to the requirements in ESA’s Policy on the Prevention, Detection and Investigation of Fraud (special reference is made to paragraph 5.8), the tenderer is","With regard to the requirement that the “consortium structure” in esa-star mirrors the Proposed Project Team in the Cover Letter, the tender is","With regard to the validity period of 4 months from the date of tender submission with implicit extensions as per Article 27, paragraphs 3&amp;4 of the Contracting Regulations, the tender is","With regard to the export/import requirements of the ITT (please refer to the Proposal Template, Section 6.4), the tender is"],"keyAcceptanceFactors":["The tender Cover Letter and the tender contain a binding price.","The Tenderer confirms, on its behalf and on behalf of its Subcontractors, to be compliant with the requirements listed in the “Certification of non-benefit” (see section 2.2.4 of the ESA Tender Conditions ).","The Tenderer confirms, on its behalf and on behalf of its Subcontractors, the acceptance of the conditions listed in the “Non commitment by the Agency” (seesection 2.2.12 of the ESA Tender Conditions ).","The tender Cover Letter and the tender contain a price type compliant with the one requested in the ITT.","The Tenderer satisfies the qualification requirements established under Article 12. Paragraphs 1 and 2 of the Contracting Regulations. The Tenderer further certifies that it, and when applicable any of its subcontractors, does not fall under any of the exclusions laid down in the Contracting Regulations under Article 12, paragraphs 3 and 14.","The tender contains a technical description.","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the requirements listed in the “Certification of free competition” (see section 2.2.3 of the ESA Tender Conditions)."],"evaluationCriterias":[{"criterion":"Compliance with administrative tender conditions and acceptance of Contract conditions.","weightingFactor":"10%"},{"criterion":"Background and experience (related in particular to the development and manufacturing of cryogenic systems, and qualification of human spaceflight facilities) of the companies and staff, including adequacy of proposed facilities.","weightingFactor":"20%"},{"criterion":"Understanding of the requirements and objectives and discussion of problem areas.","weightingFactor":"20%"},{"criterion":"Quality and suitability of proposed programme of work; adequacy and credibility of engineering approach, in general and wrt schedule.","weightingFactor":"30%"},{"criterion":"Adequacy and credibility of management, costing and planning for the execution of the work.","weightingFactor":"20%"}],"entities":[],"procurementProposal":null,"responsible":"Soisick Hamon","updateReason":"Tender Action Issued"}],"totalNew":0,"totalUpdated":0}