{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000047061","budgetReference":"E/D001-05 - ERS E1 Services PoC","classified":false,"closingDate":"2026-11-04T13:00:00","extensionRequestDeadline":"2026-10-21T13:00:00","clarificationRequestDeadline":"2026-10-21T13:00:00","description":"ERS-EO Proof of Concept on Critical Infrastructure ManagementThe ERS-EO Element 1 Critical Infrastructure Monitoring Prof of Concept is intended to demonstrate the step improvement for enhanced monitoring and management of critical infrastructure resulting from the effective combination of diverse EO and non-EO capabilities representative of the future Earth Observation Governmental Service (EOGS) capacity.  In particular, the customization and fusion of these capabilities will generate significant improvements in tasking response, persistent data collection, information delivery latency, expanded information content andflexibility and adaptability in response to dynamic situations. In this context, the Critical Infrastructure Monitoring PoC will:Stimulate innovative combinations of public and private EO systems to support improved and more flexible tasking, response latency, persistence and cross-operator cueing;Develop customized workflows connecting satellite operators, non-EO data providers, analytics tool developers and critical infrastructure operators to ensure enhanced capability to detect, characterize, respond to and mitigateemergent threats and anomalies;Verify the improvements achievable over current state of the art with respect to emerging threat detection and mitigation action execution for critical infrastructure operators under realistic operating conditions;With respect to gaps in current capabilities, elaborate technical approaches for their resolution, verify their impact under representative operational environments and conditionsand elaborate a road map for eventual transfer to full operations based on exclusively European technology. The contract will integrate existing EO and non-EO capabilities as well as capabilities at an advanced stage of development into a pre-operational network providing a range of analysis support information. The procurement will be structured into three periods as follows:Step[BJ1]  1:requirements consolidation and initial operating capability specification, implementation and testing.Step 2 initial capability demonstrations under realistic operating conditions covering extended routine threat mitigation, timely detection, characterization and response elaboration for emerging threats and anomaly/event response situationsStep 3: extended capability demonstration under fully representative conditions as agreed in the milestone review concluding Step 2 activities All underlying Information and Communication Technology (ICT) functions will be provided by the ERS-EO Element 1 Testbed.","ecosrequired":true,"establishment":"ESRIN","firstPublicationDate":"2026-07-29T09:40:50","id":192546,"idEra":25515,"initiatingService":"EOP-S","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"263","lastUpdateTime":"2026-09-23T12:51:23","lastUpdateUser":"rhamill","openDate":"2026-09-23T12:51:21","priceRange":"> 500 KEURO","programmeReference":"ERS E1 Services PoC","tanumber":"1-13656","title":"ERS-EO PROOF OF CONCEPT TO SUPPORT ENHANCED PROTECTION OF CRITICAL INFRASTRUCTURE","directorate":"Directorate of EO Programmes","countries":[{"id":1},{"id":62},{"id":27},{"id":24},{"id":23},{"id":22},{"id":17},{"id":16},{"id":67},{"id":15},{"id":11},{"id":10},{"id":9},{"id":7},{"id":6},{"id":5},{"id":2},{"id":12},{"id":168}],"products":[{"id":11}],"technologies":[{"id":26}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["With regard to the technical requirements of the ITT, the tender is","With regard to the requirement that the “consortium structure” in esa-star mirrors the Proposed Project Team in the Cover Letter, the tender is","With regard to the requirements in ESA’s Policy on the Prevention, Detection and Investigation of Fraud (special reference is made to paragraph 5.8), the tenderer is","With regard to the Agency’s “Right to Audit” (see Part 2, section 2.2.8 of the ESA Tender Conditions), the tender is","With regard to the export/import requirements of the ITT (please refer to the Proposal Template, Section 6.4), the tender is","With regard to the IPR requirements of the ITT (please refer to the Draft Contract and to the Proposal Template, Section 6.2), the tender is","With regard to the Contract conditions of the ITT (please refer to the Draft Contract and to the Proposal Template, Section 6.1.), the tender is","With regard to the financial requirements of the ITT, the tender is","With regard to the managerial requirements of the ITT, the tender is","The technical proposal is free from any plagiarism. When use is made of material being quotations or citations from existing public literature, such use is clearly indicated and due reference indications (source and author) are provided.","With regard to the validity period of six (6) months from the date of tender submission with implicit extensions as per Article 27, paragraphs 3 &amp; 4 of the Contracting Regulations ESA/REG/001, the tender is"],"keyAcceptanceFactors":["The tender Cover Letter and the tender contain price types compliant with the one requested in the ITT.","The Tenderer satisfies the qualification requirements established under Article 12. Paragraphs 1 and 2 of the Contracting Regulations. The Tenderer further certifies that it, and when applicable any of its subcontractors, does not fall under any of the exclusions laid down in the Contracting Regulations under Article 12, paragraphs 3 and 14.","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the requirements listed in the “Certification of free competition” (see section 2.2.3 of the ESA Tender Conditions).","The Tenderer confirms, on its behalf and on behalf of its Subcontractors, the acceptance of the conditions listed in the “Non commitment by the Agency” (see section 2.2.12 of the ESA Tender Conditions ).","The Tenderer confirms, on its behalf and on behalf of its Subcontractors, to be compliant with the requirements listed in the “Certification of non-benefit” (see section 2.2.4 of the ESA Tender Conditions ).","The tender Cover Letter and the tender contain a binding price.","The tender contains a technical description.","The tender is compliant with the budgetary limit applicable to the tender."],"evaluationCriterias":[{"criterion":"Compliance with administrative tender conditions and acceptance of Contract conditions.","weightingFactor":"10%"},{"criterion":"Adequacy of management, costing and planning for the execution of the work.","weightingFactor":"15%"},{"criterion":"Quality and suitability of proposed programme of work; credibility of proposed technical solution including security aspects, and adequacy of engineering approach.","weightingFactor":"25%"},{"criterion":"Background and experience (related to the particular field concerned) of the companies and staff, including credibility of stakeholder involvement and adequacy of proposed facilities.","weightingFactor":"25%"},{"criterion":"Understanding of the requirements and objectives and discussion of problem areas.","weightingFactor":"25%"}],"entities":[],"procurementProposal":null,"responsible":"Katrien Espagnet","updateReason":"Tender Action Issued"}],"totalNew":0,"totalUpdated":0}