{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000046992","budgetReference":"E/0401-01 - MP- Studies","classified":false,"closingDate":"2026-11-12T13:00:00","extensionRequestDeadline":"2026-10-29T13:00:00","clarificationRequestDeadline":"2026-10-29T13:00:00","description":"Plasma Observatory aims to study the fundamental processes responsible for plasma energisation and energy transport around shocks and near-Earth space. The mission is comprised of 7 identical sister spinning spacecraft, launched by Ariane 64 and operated on a high-elliptic orbit.The Phase B1 System Study has the following objectives:- Complete outstanding trade-offs- Consolidate requirements and interfaces- Issue of Requests for Information (RFIs) for platform subsystems and/or equipment-  Refine the development risk assessment (major risks and mitigation)- Consolidate the development and verification plan, including baseline master schedule- Refine the estimate of the industrial costs- Conduct a dialogue phase with ESA to consolidate implementation requirements (in preparation of Phase B2/C/D/E1 Invitation to Tender)- Support the Mission Adoption Review (MAR)","ecosrequired":true,"establishment":"ESTEC","firstPublicationDate":"2026-07-10T08:44:11","id":191327,"idEra":25442,"initiatingService":"SCI-F","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"000","lastUpdateTime":"2026-09-24T11:56:59","lastUpdateUser":"tgnanapr","openDate":"2026-09-17T10:17:02","priceRange":"> 500 KEURO","programmeReference":"MP- Studies","tanumber":"1-13625","title":"PLASMA OBSERVATORY (M7) SYSTEM STUDY PHASE B1 RE-ISSUE","directorate":"Directorate of Science","countries":[{"id":1},{"id":67},{"id":27},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":19},{"id":17},{"id":16},{"id":15},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":8},{"id":7},{"id":6},{"id":5},{"id":2},{"id":168}],"products":[],"technologies":[{"id":26}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["With regard to the technical requirements of the ITT, the tender is:","With regard to the validity period of 4 months from the date of tender submission with implicit extensions as per Article 27, paragraphs 3&amp;4 of the Contracting Regulations, the tender is","With regard to the requirement that the “consortium structure” in esa-star mirrors the Proposed Project Team in the Cover Letter, the tender is","With regard to the requirements in ESA’s Policy on the Prevention, Detection and Investigation of Fraud (special reference is made to paragraph 5.8), the tenderer is","With regard to the Agency’s “Right to Audit” (see Part 2, section 2.2.8 of the ESA Tender Conditions), the tender is","With regard to the export/import requirements of the ITT (please refer to the Part 3, section 3.6.4 of the ESA Tender Conditions), the tender is:","With regard to the IPR requirements of the ITT (please refer to the Part 3, section 3.6.3 of the ESA Tender Conditions), the tender is:","With regard to the Contract conditions of the ITT (please refer to the Draft Contract and to Part 3, section 3.6.1 of the ESA Tender Conditions), the tender is:","With regard to the financial requirements of the ITT, the tender is:","With regard to the managerial requirements of the ITT, the tender is:","The technical proposal is free from any plagiarism. When use is made of material being quotations or citations from existing public literature, such use is clearly indicated and due reference indications (source and author) are provided."],"keyAcceptanceFactors":["The tender Cover Letter and the tender contain a price type compliant with the ones requested in the ITT.","The Tenderer satisfies the qualification requirements established under Article 12. Paragraphs 1 and 2 of the Contracting Regulations. The Tenderer further certifies that it, and when applicable any of its subcontractors, does not fall under any of the exclusions laid down in the Contracting Regulations under Article 12, paragraphs 3 and 14.","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the requirements listed in the “Certification of free competition” (see section 2.2.3 of the ESA Tender Conditions).","The Tenderer confirms, on its behalf and on behalf of its Subcontractors, the acceptance of the conditions listed in the “Non commitment by the Agency” (seesection 2.2.12 of the ESA Tender Conditions ).","The Tenderer confirms, on its behalf and on behalf of its Subcontractors, to be compliant with the requirements listed in the “Certification of non-benefit” (see section 2.2.4 of the ESA Tender Conditions ).","The tender Cover Letter and the tender contain a binding price.","The tender contains a technical description.","The tender is compliant with the budgetary limits applicable to the tender as detailed in section 2.5 of the cover letter."],"evaluationCriterias":[{"criterion":"Compliance with administrative tender conditions and acceptance of Contract conditions.","weightingFactor":"10%"},{"criterion":"Adequacy of planning, management and costing  for the execution of the work.","weightingFactor":"10%"},{"criterion":"Quality and suitability of proposed programme of work; adequacy of engineering approach.","weightingFactor":"30%"},{"criterion":"Background and experience (general and related to the particular field concerned) of the companies and staff, including adequacy of proposed facilities.","weightingFactor":"20%"},{"criterion":"Understanding of the requirements and objectives and discussion of problem areas.","weightingFactor":"30%"}],"entities":[],"procurementProposal":null,"responsible":"Pauline Bastie","updateReason":"Tender Action Package Updated"}],"totalNew":0,"totalUpdated":0}