{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000046650","budgetReference":"E/0901-01 - Technology Developme","classified":false,"closingDate":"2026-09-30T13:00:00","extensionRequestDeadline":"2026-09-23T13:00:00","clarificationRequestDeadline":"2026-09-23T13:00:00","description":"Objective: To design and assess the life cycle of an optimised harness including cables, connectors, and back-shell components, allmanufactured using eco-friendly processes and alternative materials.Description: Spacecraft harnesses are essential for power distribution, data transmission, and signal integrity within satellites and other spacecraft systems. However, conventional harness designs rely on materials and manufacturing techniques that have a significant environmental impact, such as PTFE (Polytetrafluoroethylene)-based insulation, gold and nickel plating, and energy-intensive production processes. The ecodesign harness initiative focuses on the development of a sustainable harness architecture, incorporating alternative materials and environmentally optimised production methods. This includes innovative approaches to conductors, insulation, jacket, connectors, accessories, tie bases, assembly processes and integration, all tailored for space qualification. This activity aims to minimise environmental impact while maintaining space-grade reliability and performance, contributing to the broader vision of sustainable space through responsible material selection, reduced emissions, and improved end-of-life strategies. A comprehensive life cycle assessment (LCA) will be performed to comparethe environmental impacts of the optimised harness against conventional designs, from raw material extraction through to end-of-life,including phases such as manufacturing, integration, launch, and decommissioning. This activity encompasses the following tasks: - Trade-off analysis and environmental impact assessment. - Key environmental contributors identification. - Optimisation actions and technical feasibility. - Characterisation and LCA validation.Deliverables: Breadboard, ReportProcurement Policy: C(1) = Activity restricted to non-prime contractors (incl. SMEs).  For additional information please go to:http://www.esa.int/About_Us/Business_with_ESA/Small_and_Medium_Sized_Enterprises/Opportunities_for_SMEs/Procurement_policy_on_fair_access_for_SMEs_-_the_C1-C4_Clauses","ecosrequired":true,"establishment":"ESTEC","firstPublicationDate":"2026-05-22T15:37:11","id":187953,"idEra":25171,"initiatingService":"TEC-EDC","ipmeasure":"C1","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"262","lastUpdateTime":"2026-09-15T10:59:29","lastUpdateUser":"ltena","openDate":"2026-08-18T11:10:07","priceRange":"200-500 KEURO","programmeReference":"Technology Developme","tanumber":"1-13554","title":"ECODESIGN HARNESS FOR SPACE APPLICATIONS -EXPRO+","directorate":"Directorate of Tech, Eng.  Quality","countries":[{"id":1},{"id":168},{"id":67},{"id":27},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":19},{"id":17},{"id":16},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":8},{"id":7},{"id":6},{"id":5},{"id":2},{"id":15}],"products":[{"id":593}],"technologies":[{"id":401}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter."],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 10 of the Cover Letter of the Proposal Template);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.7 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.8 of the EXPRO/TC);","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the ITT;","The Tenderer confirms that the tender is compliant with the budgetary limit applicable to the ITT;"],"evaluationCriterias":[{"criterion":"Background and experience (related to the particular field concerned) of the company(ies) and staff, including adequacy of the proposed facilities ","weightingFactor":"30%"},{"criterion":"Understanding of the objectives of the activity and discussion of the problem areas, and adequacy of the programme of work","weightingFactor":"50%"},{"criterion":"Adequacy of the time dedication and costing, compliance with administrative tender conditions and acceptance of the contract conditions","weightingFactor":"20%"}],"entities":[],"procurementProposal":null,"responsible":"Mireia Morera","updateReason":"Tender Clarification has been published"}],"totalNew":0,"totalUpdated":0}