{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000045345","budgetReference":"E/0534-03C - 5G/6G - Advanced Tec","classified":false,"closingDate":"2026-09-25T13:00:00","extensionRequestDeadline":"2026-09-11T13:00:00","clarificationRequestDeadline":"2026-09-11T13:00:00","description":"Objective: The objective of the activity is to develop and test a 5G NTN dual active modem prototype with active resource management for improving link reliability and performance, whileoptimizing the space segment resources utilization.TargetedImprovements:-doubling the peak data rate compared to state of art modems.- reduction by half link outage time.Description: The need for a dual-active modem in 5G Non-Terrestrial Networks (NTN) arises from the growing demand for reliable, high-performance communication links particularly inscenarios where terrestrial networks are unavailable or unreliable. A dual-active NTN modem can maintain two simultaneous satellite links, significantly reducing the risk ofoutages caused by shadowing, fading or interference. At the same time, it provides an additional communication channel that enables load balancing across space segmentnodes, helping to distribute traffic efficiently and improve peak user data rates. Active resource management is essential in this context. Strategies must be designed todynamically allocate resources based on real-time link conditions and performance metrics. These strategies should ensure that the satellite system can optimize keyperformance indicators, such as peak data rate and service availability, while minimizing the resources allocated to each link and network node (e.g. payloads). Developingcontrol plane methodologies is also a critical aspect of this solution. The control plane manages the signalling and control information required for the operation of thecommunication links. It enables the system to gather real-time measurements of links conditions, which are essential for making informed decisions about resource allocationand link management. These methodologies also provide mechanisms for communicating decisions to the network including satellites and user terminals ensuring that thesystem can adapt to changing conditions and maintain optimal performance.This activity will develop a prototype dual-active 5G modem, potentially based on open radio stacks, and implement a testbed to evaluate the prototype under realisticconditions. This testbed will include a channel emulator with multiple RF interfaces to emulate themultiple links. Channel performance as well as satellite system resourcesallocation will be tested for various operational scenarios, and both resource management methodologies and control plane techniques will be assessed.Procurement Policy: C(1) = Activity restricted to non-prime contractors (incl. SMEs).  For additional information please go to:http://www.esa.int/About_Us/Business_with_ESA/Small_and_Medium_Sized_Enterprises/Opportunities_for_SMEs/Procurement_policy_on_fair_access_for_SMEs_-_the_C1-C4_Clauses","ecosrequired":false,"establishment":"ESTEC","firstPublicationDate":"2026-05-18T11:22:10","id":187383,"idEra":25110,"initiatingService":"RNC-FTG","ipmeasure":"C1","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"000","lastUpdateTime":"2026-06-09T17:28:43","lastUpdateUser":"spancott","openDate":"2026-06-09T17:28:41","priceRange":"> 500 KEURO","programmeReference":"5G/6G - Advanced Tec","tanumber":"1-13527","title":"DUAL-ACTIVE 5G NON-TERRESTRIAL NETWORK MODEM WITH SMART RESOURCE MANAGEMENT (ARTES 4.0 SPL 5G/6G 7A.089) - EXPRO+","directorate":"Dir. of Connectivity  Secure Comm.","countries":[{"id":1},{"id":168},{"id":67},{"id":62},{"id":26},{"id":24},{"id":23},{"id":22},{"id":19},{"id":17},{"id":16},{"id":15},{"id":13},{"id":11},{"id":10},{"id":9},{"id":6},{"id":2}],"products":[{"id":26}],"technologies":[{"id":179}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter."],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 10 of the Cover Letter of the Proposal Template);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.7 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.8 of the EXPRO/TC);","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the ITT;","The Tenderer confirms that the tender is compliant with the budgetary limit applicable to the ITT;","For tenders where LSI company(ies) are participating in the tender as Subcontractor(s), the Cover Letter of the tender confirms that all the conditions for LSI participation are fulfilled and indicates the dedicated section of the tender where this evidence is provided.\n","The Tenderer confirms that supporting evidence of the authorisation of funding from the relevant Participating State(s) is provided as part of the Tender cover letter and in accordance with the requirements of section 4 of the Cover letter to the present ITT."],"evaluationCriterias":[{"criterion":"Background and experience (related to the particular field concerned) of the company(ies) and staff, including adequacy of the proposed facilities","weightingFactor":"30%"},{"criterion":"Understanding of the objectives of the activity and discussion of the problem areas, and adequacy of the programme of work","weightingFactor":"50%"},{"criterion":"Adequacy of the time dedication and costing, compliance with administrative tender conditions and acceptance of the contract conditions","weightingFactor":"20%"}],"entities":[],"procurementProposal":null,"responsible":"Giusy Menghini","updateReason":"Tender Action Issued"}],"totalNew":0,"totalUpdated":0}