{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000046584","budgetReference":"E/A001-01 - FEO1S3 Pillar1 EOP-F","classified":false,"closingDate":"2026-10-01T13:00:00","extensionRequestDeadline":"2026-09-17T13:00:00","clarificationRequestDeadline":"2026-09-17T13:00:00","description":"AURION aims to establish a structured pre-Phase-0 co-design environment in which scientific ambition and industrial feasibility aredeveloped concurrently to define credible, innovative Earth Observation mission concepts.The activity targets mission concepts at SRL =3 that have not previously been assessed within ESA, and enables their maturation through joint science-industry system-level design, including early assessment of technical feasibility, cost drivers, and programmatic viability.AURION studies are characterised by:Joint science-industry leadership (mandatory co-design) Concurrent SRL and TRL maturationFocus on novel mission concepts, not incremental extensions Early integration of industrial feasibilityExplicit treatment of technical, cost, and programmatic riskSelected consortia shall perform integrated science-engineering co-design studies covering:Definition of measurement concept and observing principleExploration of mission architectures (orbit, geometry, constellation vs monolithic)Elaboration ofpreliminary Level-1 and Level-2 mission requirementsIdentification and maturation pathway of critical enabling technologies (TRL13+) Development of end-to-end data chain, including calibration and processing Preliminary cost and risk assessmentActivities shall remain strictly within pre-Phase-0, shall not converge prematurely to a single industrial solution, and shall maintain architectural optionality through structured trade-space exploration.","ecosrequired":false,"establishment":"ESTEC","firstPublicationDate":"2026-05-18T10:42:44","id":187330,"idEra":25120,"initiatingService":"EOP-F","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"000","lastUpdateTime":"2026-09-10T17:09:02","lastUpdateUser":"ltena","openDate":"2026-07-02T16:54:58","priceRange":null,"programmeReference":"FEO1S3 Pillar1 EOP-F","tanumber":"1-13532","title":"AURION ADVANCING UNDERSTANDING THROUGH RESEARCH AND INDUSTRY-ORIENTED CO-DESIGN OF NEW MISSIONS - EXPRO PLUS","directorate":"Directorate of EO Programmes","countries":[{"id":1},{"id":67},{"id":62},{"id":28},{"id":27},{"id":26},{"id":24},{"id":23},{"id":22},{"id":20},{"id":19},{"id":18},{"id":17},{"id":16},{"id":15},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":8},{"id":7},{"id":6},{"id":5},{"id":4},{"id":2},{"id":168}],"products":[],"technologies":[{"id":26}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter"],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 10 of the Cover Letter of the Proposal Template);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.7 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.8 of the EXPRO/TC);","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the ITT;","The Tenderer confirms that the tender is compliant with the budgetary limit applicable to the ITT;","[OPTION]\nThe Tenderer confirms that it accepts the non-negotiable contract conditions.\n[END OPTION] \n","[OPTION: to be specified by CO: Additional KAF if any:\n9.\tThey can result from:\n•\tProgramme requirements (e.g. ARTES Core Competitiveness Element - Component A: Advanced Technology);\n•\tC1-C4 measures (see section 4 below), note to CO: insert here and in esa-star Tendering the text for the applicable C Measure as a KAF:\n"],"evaluationCriterias":[{"criterion":"Background and experience (related to the particular field concerned including instrument and mission concept design and analysis) of the company(ies) and staff","weightingFactor":"30%"},{"criterion":"Understanding of the objectives of the activity and discussion of the problem areas, adequacy of the programme of work, adequacy of approach to scientific and industrial co-design, technical innovation and novelty of proposed mission concepts, and adequacy and completeness of their first iteration in the proposal.","weightingFactor":"50%"},{"criterion":"Adequacy of the time dedication and costing, compliance with administrative tender conditions and acceptance of the contract conditions","weightingFactor":"20%"}],"entities":[],"procurementProposal":null,"responsible":"Jacopo Brilli","updateReason":"Tender Clarification has been published"}],"totalNew":0,"totalUpdated":0}