{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000046590","budgetReference":"E/0901-01 - Technology Developme","classified":false,"closingDate":"2026-10-15T13:00:00","extensionRequestDeadline":"2026-10-08T13:00:00","clarificationRequestDeadline":"2026-10-08T13:00:00","description":"Currently multi-asset simulations of exploration missions comprised of i.e. robotic assets,orbiters/relays and ground data systemsare performed individually and mostly in isolation byindividual sites with respective simulators for each asset. The goal of this activity is to investigatemulti-asset, distributed simulations capabilities for full end-to-end mission simulations of futureexploration missions spanning lander, orbiters, relays and surface assets in different locations.This activity investigates the various scenarios (i.e. current ExoMars simulation architectures, futureneeds of the Sample Fetch Rover (SFR) and European Large Logistic Lander (EL3) missions) andhow, within their respective mission scenarios, simulation systems can be distributed, synchronizedand orchestrated either in local (i.e. data center) environments, or across different agencies orindustrial partners.The challenge to beaddressed is to achieve the capability to execute full mission segments (suchas full egress campaigns) with all distributed teams and experts - usually distributed over differentagencies and industrial partners in a as realistic as possible set-up, meaning interactions,coordination and real-time data during the simulation shall be available to all actors within thesimulation. Various technological frameworks exist to interconnect simulators on the technical level.However, this activity shall specifically focus on thecoordination aspects, synchronousmanagement or orchestration that is required and suitable above the pure interfaces level to realizesuch distributed simulations. To validate defined architectures, using agile developmentmethodologies this activity aims at developing a proof of concept to demonstrate keyrecommendations of this activity. The final architecture and technology recommendations that couldsupport future SFR and EL3 mission simulation needs is captured in a roadmap for theirintroduction.","ecosrequired":true,"establishment":"ESOC","firstPublicationDate":"2026-05-18T10:42:39","id":187329,"idEra":25133,"initiatingService":"OPS-GAP","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"000","lastUpdateTime":"2026-09-02T17:00:09","lastUpdateUser":"rhamill","openDate":"2026-09-02T17:00:07","priceRange":"200-500 KEURO","programmeReference":"Technology Developme","tanumber":"1-13544","title":"T309-801GD MULTI-ASSET DISTRIBUTED SIMULATIONS (EXPRO+)","directorate":"Directorate of Operations","countries":[{"id":1},{"id":168},{"id":67},{"id":27},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":19},{"id":17},{"id":16},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":8},{"id":7},{"id":6},{"id":5},{"id":2},{"id":15}],"products":[{"id":14}],"technologies":[{"id":221}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter."],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 10 of the Cover Letter of the Proposal Template);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.7 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.8 of the EXPRO/TC);","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the ITT;","The Tenderer confirms that the tender is compliant with the budgetary limit applicable to the ITT;"],"evaluationCriterias":[{"criterion":"Background and experience (related to the particular field concerned) of the company(ies) and staff.","weightingFactor":"45%"},{"criterion":"Understanding of the objectives of the activity and discussion of the problem areas, and adequacy of the programme of work.","weightingFactor":"40%"},{"criterion":"Adequacy of the time dedication and costing, compliance with administrative tender conditions and acceptance of the contract conditions.","weightingFactor":"15%"}],"entities":[],"procurementProposal":null,"responsible":"Angelique Pruetz","updateReason":"Tender Action Issued"}],"totalNew":0,"totalUpdated":0}