{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000045857","budgetReference":"E/0534-03A - 5G-Other Act. Prod&T","classified":false,"closingDate":"2026-12-07T13:00:00","extensionRequestDeadline":"2026-11-23T13:00:00","clarificationRequestDeadline":"2026-11-23T13:00:00","description":"Objective: The objective of this activity is to design a satellite system for FRMCS which is operating in the same frequency bands as the terrestrial counterpart (i.e., 900 MHz and 1.9 GHz), with the purpose to exclusively service the coverage gaps of the terrestrial network while avoiding interference. The performance of such system will be evaluated with the development of a system simulator.Targeted Improvements: - Reduce by 80% the cost of the satellite system for FRMCS.- Reduce by 50% the cost of on-board railway terminals, by allowing a single terminal solution for terrestrial and satellite FRMCS connectivity.Description: The Future RailwayMobile Communication System (FRMCS), being a successor of the GSM-R system, is planned to be operational before GSM-R's predicted saturation in 2030. Through standardisation work, satcom is established as a component of the future system, while it is found that the satellite integration into FRMCS is simplified when satcom is employing the 5G NR, which is the selected air interface for the terrestrial FRMCS access. However, the frequency bands for such a service via satellite and the design of the satellite system are yetto be concluded. The advantages of an innovative approach, where the satellite offers connectivity exclusively to the coverage gapsofsuch terrestrial network, have been recently reported. In fact, such a satellite system targeting only the terrestrial coverage gaps while ignoring the areas serviced by theterrestrial network, will have a lower complexity and overall cost, as fewer satellites of less capacity will be required. In addition, such a satellite system will be able to operate in the same frequency bands as theterrestrial network (i.e., 900 MHz and 1.9 GHz), as each network (terrestrial or satellite) will not be available in the same area where the other network operates and therefore they will not interfere with each other. This usage of the same frequency from the satellite and the terrestrial network not only facilitates the integration of the two networks into FRMCS, but also potentially allow the usage of the same terminal for both networks, a solution that is very favourable for railway operators. This activity will thereforeinvestigate the design of a 5G NR based satellite system for FRMCS which exclusively targets the terrestrial network gaps of communication and operates in the same frequency bands as the terrestrial FRMCS network. The activity will include a traffic characterisation and capacity analysis for the terrestrial network gaps which will then feed the system design and the element sizing of the ground and space components. The impact of the railway-satellite channel for the 900 MHz and the 1900 GHz will also be thoroughly investigated. The best numerologies and 5G NR configurations will also be identified for such a satellite system. The work will be supported by the development of a system simulator which will investigate the FRMCS 5G NR satellite link performance and achieved C/I ratios under a variety of different orbits, system architectures, frequency bands, channel conditions and air interface configurations. The activity will also investigate and conclude on the feasibility of having a single modem and a single antenna equipped on board the trains, which offer connectivity both to the satellite and the terrestrial network at different time instances.","ecosrequired":false,"establishment":"ECSAT","firstPublicationDate":"2026-05-01T09:11:52","id":186399,"idEra":25030,"initiatingService":"CIP-PT","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"000","lastUpdateTime":"2026-10-14T16:38:05","lastUpdateUser":"sapancot","openDate":"2026-10-14T16:38:00","priceRange":"> 500 KEURO","programmeReference":"5G-Other Act. Prod&T","tanumber":"1-13481","title":"FUTURE RAILWAY MOBILE COMMUNICATION SYSTEM (FRMCS) SATELLITE SYSTEM SIMULATOR FOR LOW FREQUENCY SPECTRUM (ARTES 4.0 SPL 5G/6G 3F.018) EXPRO+ (RE-ISSUE 1-12659)","directorate":null,"countries":[{"id":1},{"id":62},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":19},{"id":67},{"id":17},{"id":15},{"id":13},{"id":11},{"id":10},{"id":9},{"id":6},{"id":2},{"id":16},{"id":168}],"products":[{"id":25}],"technologies":[{"id":245}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter."],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 10 of the Cover Letter of the Proposal Template);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.7 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.8 of the EXPRO/TC);","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the ITT;","The Tenderer confirms that the tender is compliant with the budgetary limit applicable to the ITT;","The Tenderer confirms that it accepts the non-negotiable contract conditions.\n","The Tenderer confirms that: supporting evidence of the authorisation of funding from the relevant Participating State(s) is provided as part of the Tender cover letter and in accordance with the requirements of section 4 of the Cover letter to the present ITT."],"evaluationCriterias":[{"criterion":"Background and experience (related to the particular field concerned) of the company(ies) and staff, including adequacy of proposed facilities. ","weightingFactor":"40%"},{"criterion":"Understanding of the objectives of the activity and discussion of problem areas, and adequacy of the programme of work.","weightingFactor":"40%"},{"criterion":"Adequacy of time dedication and costing, compliance with administrative tender conditions and acceptance of the contract conditions.","weightingFactor":"20%"}],"entities":[],"procurementProposal":null,"responsible":"Giusy Menghini","updateReason":"Tender Action Issued"}],"totalNew":0,"totalUpdated":0}