{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000045557","budgetReference":"E/E312-01 - S2NG Ph B2CD","classified":false,"closingDate":"2026-12-07T13:00:00","extensionRequestDeadline":"2026-11-23T13:00:00","clarificationRequestDeadline":"2026-11-23T13:00:00","description":"The Copernicus Sentinel-2 Next Generation space component, which is the subject of this procurement, will ensure a seamless continuation of the current Sentinel-2 first generation capabilities, whilst increasing both the quantity and quality of the products. The development of the Sentinel-2 Next Generation (Sentinel-2 NG) Space Component aims to build upon and enhance the initial observations provided by the first generation. In particular, Sentinel-2 NG (S2NG) will respond to the needs of Copernicus Services, with particular emphasis to the Land Monitoring Service (CLMS) and the Emergency Management Service (CEMS), together with, as secondary objective, the Marine Environment Monitoring Service (CMEMS). This will be characterised by enhanced spatial sampling and spectral sampling compared to Sentinel-2 first generation. S2 NG will provide observations for the next generation of operational products such as landcover maps, land-change detection maps, and geophysical properties,  together with, as secondary objective, for the next generation of operational products over a larger portion of coastal and marine waters compared to Sentinel-2. S2NG will provide quantitative evidence in support to European and global policies, including the Green Deal, the Common Agricultural Policy (CAP), the EU Forest Strategy, the EU Biodiversity Strategy, the EU Soil Strategy, the EU Water Framework and the UN SDGs. The S2NG space segment is expected to comprise of a constellation of two identical satellites (A- and B-units) flying at an altitude of approximately 650 km, in a sun-synchronous orbit. Each satellite will embark a payload comprised of the Advanced Multi-Spectral Imager (AMSI) instrument with two detection chains, one for Visible and Near-Infrared (VNIR) detection and one for the Short Wavelength Infrared (SWIR) detection, with a total of 21 bands (16 in VNIR, 5 in SWIR).The ITT for the Sentinel-2 NG Phases B2/C/D/E1 is in open competition. The ITTwill cover all spacecraft development phases (B2/C/D/E1) of the complete Sentinel-2 NG Model A Spacecraft (i.e. including Payload and Spacecraft subsystems), and the Model B Spacecraft the latter through a contractual mandatory option. This ITT will be arranged in two Contractual Phases as follows: Phase 1 will include:  - all Payload Instruments activities up to the Sentinel-2 NG Model A Instrument Preliminary Design Review, and subsequent payload advanced phase C activities up to the end of the satellite Phase B2 (PDR);- all Sentinel-2 NG spacecraft activities, including the System Requirements Review (SRR), up to and including the Satellite Preliminary Design Review (PDR); and - the procurement of relevant long lead Items (LLI) for both Sentinel-2 NG Model A and Model B Spacecraft. Phase 2 will include: - All remaining Spacecraft activities up to and including the Sentinel-2 NG Model A Spacecraft Qualification and Flight Acceptance Review (QAR).Additional information: The Invitation to Tender (ITT) will be published on ESA Star. In order to access the ITT Package, Tenderers must be registered in esa-star as potential ESA suppliers. Any Tenderer, which is not yet registered with ESA as a potential supplier, must complete the online questionnaire in esa-star, https://esastar-emr.sso. esa.int/. Further information on the registration process can be found in ESA's INDUSTRY PORTAL available at: - http://www.esa.int/About_Us/Business_with_ESA/esa-star_open_for_business - http://www.esa.int/About_Us/Business_with_ESA/How_to_do/esa-star_Registration_Process Please note that esa-star allows two levels of entity registration: \"Light\" and \"Full\". This allows new users wishing to do business with ESA to carry out their registration in two steps. While \"Light\" registration will grant access to all esa-star services up to and including proposal submission, the award of ESA contracts requires \"Full\" registration.","ecosrequired":true,"establishment":"ESTEC","firstPublicationDate":"2026-04-23T08:57:16","id":185953,"idEra":24633,"initiatingService":"EOP-PU","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"000","lastUpdateTime":"2026-09-17T10:15:36","lastUpdateUser":"ltena","openDate":"2026-04-29T10:38:56","priceRange":"> 500 KEURO","programmeReference":"S2NG Ph B2CD","tanumber":"1-13287","title":"SENTINEL-2 NEXT GENERATION SATELLITE PHASES B2CDE1","directorate":"Directorate of EO Programmes","countries":[{"id":1},{"id":62},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":19},{"id":17},{"id":16},{"id":15},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":7},{"id":6},{"id":5},{"id":2},{"id":67},{"id":168},{"id":21},{"id":20},{"id":18},{"id":14},{"id":8},{"id":4},{"id":3},{"id":27},{"id":28},{"id":118}],"products":[{"id":318}],"technologies":[{"id":26}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["With regard to the technical requirements of the ITT, the tender is","With regard to the requirements in ESA’s Policy on the Prevention, Detection and Investigation of Fraud (special reference is made to paragraph 5.8), the tender is","With regard to the Agency’s “Right to Audit” (see Part 2 B-7 of the GCT), the tender is","With regard to the export/import requirements of the ITT (please refer to the present Special Conditions of Tender - Part 3 – let G section 4), the tender is","With regard to the IPR requirements of the ITT (please refer to the present Special Conditions of Tender - Part 3 -let. G section 3), the tender is","With regard to the financial requirements of the ITT, the tender is","With regard to the managerial requirements of the ITT, the tender is","The technical proposal is free from any plagiarism. When use is made of material being quotations or citations from existing public literature, such use is clearly indicated and due reference indications (source and author) are provided.","With regard to the Contract conditions of the ITT (please refer to the Draft Contract and to the present Special Conditions of Tender - Part 3 – let. G section1), the tender is"],"keyAcceptanceFactors":["The tender Cover Letter and the tender contain a binding price, in case of Co-Contractorship with the share of the price among the Co-Contractors.","The Tender contains at least 25% of the Contract Reference Value to Non LSI and Non SME economic operators.","The Tenderer, in case of Co-Contractorship confirms that the “consortium structure” in esa-star mirrors the Proposed Project Team in the Cover Letter.","The Tenderer, in case of Co-Contractorship confirms that it and its subcontractor(s) completed at least the “Light Registration” in esa-star Registration.","Independently from the level of completion of the Industrial Consortium at the time of the tender submission, the Tenderer, in case of Co-Contractorship confirms that it undertakes the full commitment for price, schedule and technical performance of the full contract, including all subcontractor tasks.","The tender contains a technical description.","The tender cover letter contains a confirmation that the validity period is 9 months from the date of tender submission with implicit extensions as per Article 37 points 3 &amp;4 of the Procurement Regulations ESA/REG/001, rev. 5.","The tender cover letter and the tender contain a price type per phase and for the options compliant with the one requested in the ITT.","The tender Cover Letter is signed by authorised representative(s) of the Tenderer. ","The Tenderer confirms, on its behalf and (in case of Co-Contractorship) on behalf of the other Co-Contractor(s)), and on behalf of its (and in case of  Co-Contractorship the other Co-Contractor’(s’)) Subcontractor(s), the acceptance of the conditions listed in the “Non commitment by the Agency” (see Part 2 B-11 of the GCT).","The Tenderer confirms, on its behalf (and in case of Co-Contractorship on behalf of the other Co-Contractor(s)), and when applicable, of its (and in case of /Co-Contractorship the other Co-Contractor’(s’)) Subcontractor(s), to be compliant with the requirements listed in the “Certification of free competition” (see Part 2 B-3 of the GCT).","The Tenderer confirms, on its behalf (and in case of Co-Contractorship on behalf of the other Co-Contractor(s)), and when applicable, of its (and in case of Co-Contractorship the other Co-Contractor’(s’)) Subcontractor(s) that no individual fall under the scope of EU Restrictive Measures and thus is not a Restricted Person.","The Tenderer satisfies the qualification requirements established under Article 18.1 of the Procurement Regulations as modified by the FFPA. The Tenderer further certifies that it, (and in case of a Co-Contractorship the other Co-Contractor(s)), and when applicable any of its (and in case of Co-Contractorship the other Co-Contractor’(s’)) Subcontractor(s), does not fall under any of the exclusions laid down in the Procurement Regulations under Article 18, paragraphs 2 and 12.","The Tender contains in addition at least 5% of the Contract Reference Value to SME.","The Tenderer confirms, on its behalf and in case of Co-Contractorship on behalf of the other Co-Contractor(s)), and on behalf of its (and in case of  Co-Contractorship the other Co-Contractor’(s’)) Subcontractor(s), to be compliant with the requirements listed in the “Certification of non-benefit” (see Part 2 H of the GCT  )."],"evaluationCriterias":[{"criterion":"Adequacy of management, costing and planning for the execution of the work including adequacy of the proposed Industrial consortium and of the Industrial Procurement Plan, credibility of the planning w.r.t. the need dates; credibility of the proposed costing.","weightingFactor":"30%"},{"criterion":"Quality and suitability of proposed programme of work, compliance to the Statement of Work, adequacy of engineering, testing and verification approach and logic; and identification if risks and proposal for risk mitigation.","weightingFactor":"25%"},{"criterion":"Understanding of the objectives and requirements, compliance to the technical requirements and discussion of problem areas.","weightingFactor":"20%"},{"criterion":"Compliance with tender conditions; compliance with industrial policy requirements, fairness of subcontractor selection made in competition and acceptance of contract conditions.","weightingFactor":"10%"},{"criterion":"Background, and experience (general and related to the particular field concerned) of the company(ies) and proposed key personnel; adequacy of the proposed facilities for Prime, Instrument and major subcontractors’ activities.","weightingFactor":"15%"}],"entities":[],"procurementProposal":null,"responsible":"Anna Ipsilanti","updateReason":"Tender Clarification has been published"}],"totalNew":0,"totalUpdated":0}