{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000046278","budgetReference":"E/0901-01 - Technology Developme","classified":false,"closingDate":"2026-09-29T13:00:00","extensionRequestDeadline":"2026-09-22T13:00:00","clarificationRequestDeadline":"2026-09-22T13:00:00","description":"To develop an active antenna combined software and hardware demonstrator representative of a LEO satellite payload by exploiting advanced strategies for real time dynamically managing radio resources.Description: On-board satellite resource allocationstrategiesare essential for managing the distribution of limited resources from the antennas to multiple user terminals. These strategies involve dynamic allocation techniques that can adjust in real-time based on traffic demand. However, in dense traffic scenarios like onboard LEO satellites, these strategies face significant challenges. The high volume of demand can lead to congestion, resulting in increased latency and reduced QoS. Additionally, the limited on-board processing capability challenges the satellite's ability to efficiently manage traffic which leads to degraded antenna performance. Considering these challenges, the objective of this activity isto develop an active antenna combined software and hardware demonstrator representative of a LEO satellite payload by exploiting advanced strategies for dynamically managing radio resources, i.e. beamforming for real time tracking and coverage change combined with power and bandwidth allocation. Resource allocation should be defined as an optimization problem, considering factors like channelconditions, user demands, interference levels, and power constraints. This activity encompasses the following tasks: - Derive real-time complex coefficients, using optimization strategies for the beamforming network. - Emulate users' movement and channel changes for proactive beam steering. - Develop models to detect and classify interference sources and use optimization techniquesfor mitigation. - Manufacture and test a proof-of-concept hardware demonstrator with a limited size active phased array and associated adaptivebeamforming, mounted on a mechanically movable platform with additional antennas located in fixed positions.","ecosrequired":true,"establishment":"ESTEC","firstPublicationDate":"2026-04-23T08:56:45","id":185949,"idEra":24985,"initiatingService":"TEC-EFA","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"262","lastUpdateTime":"2026-09-17T11:27:25","lastUpdateUser":"system","openDate":"2026-07-01T13:22:48","priceRange":"> 500 KEURO","programmeReference":"Technology Developme","tanumber":"1-13458","title":"LEO CONSTELLATIONS REAL-TIME RADIO RESOURCE MANAGEMENT DEMONSTRATOR - EXPRO PLUS","directorate":"Directorate of Tech, Eng.  Quality","countries":[{"id":1},{"id":168},{"id":67},{"id":27},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":19},{"id":17},{"id":16},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":8},{"id":7},{"id":6},{"id":5},{"id":2},{"id":15}],"products":[{"id":380}],"technologies":[{"id":200}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter. "],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 10 of the Cover Letter of the Proposal Template);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.7 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.8 of the EXPRO/TC);","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the ITT;","The Tenderer confirms that the tender is compliant with the budgetary limit applicable to the ITT;"],"evaluationCriterias":[{"criterion":"Background and experience (related to the particular field concerned) of the company(ies) and staff, including adequacy of the proposed facilities ","weightingFactor":"30%"},{"criterion":"Understanding of the objectives of the activity and discussion of the problem areas, and adequacy of the programme of work","weightingFactor":"50%"},{"criterion":"Adequacy of the time dedication and costing, compliance with administrative tender conditions and acceptance of the contract conditions","weightingFactor":"20%"}],"entities":[],"procurementProposal":null,"responsible":"Veljko Radojevic","updateReason":"Tender Clarification has been published"}],"totalNew":0,"totalUpdated":0}