{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000045218","budgetReference":"E/0534-01K - IC1 - Advanced Techn","classified":false,"closingDate":"2026-09-25T13:00:00","extensionRequestDeadline":"2026-09-11T13:00:00","clarificationRequestDeadline":"2026-09-11T13:00:00","description":"Objective: The objective of the activity is to design, build and test standardised functional power modules resulting in a Commercial-off-the-Shelf-based Power Conditioning and Distribution Unit (PCDU) consisting of the solar array regulator, the controller module, the battery management module, the power distribution module and the deployment module, for telecomsconstellations applications.Techniques and technologies to improve the power efficiency will be studied and implemented as well as health monitoring capabilities as needed to comply with Zero Debris requirements.Targeted Improvements: - Power module manufacturing time reduction by 80% andreduction of risk of production delay- PCDU efficiency improvement of up to 15% thanks to solar regulator efficiency improvement by10 percentage points and 50% improvement of the power distribution module.Description: Typical space power units are designed andbuilt to comply with project-specific specifications. As a consequence, manufacturers implement different solutions, which are notcompatible nor interoperable. Therefore, a specific power unit can only be built by a specific manufacturer. When large number of units have to be built this often poses a supply chain challenge. APA is an advanced power architecture standard developed with EuropeanPrimes with the potential to overcome supply chain bottlenecks. It aims at standardising the electrical and mechanical interfaceofmodular power distribution units and hence unit production can easily be spread among multiple suppliers.This activity will identify opportunities for standardisation of power control modules for constellations satellites taking the APA and other available standards as a starting point. The activity will then design, manufacture and test key functional power modules for a Commercial-Off-The-Shelf (COTS) based Power Conditioning and Distribution Unit (PCDU),consisting of the solar array regulator, the controller module,the battery management module, the distribution module and the deployment module, for telecoms constellations applications. Techniquesand technologies to improve the power efficiency will be studied. This shall include wide band-gap semiconductor technology and theuse of switchedlatching current limiters. Health monitoring capabilities as needed to comply with Zero Debris requirements willbe developed and implemented. Standardised power control engineering modules will be built, tested and assembled forming a COTS-based PCDU full engineering model. Testing will be carried out in a representative environment to evaluate the performance.Procurement Policy: C(2) = A relevant participation (in terms of quality and quantity) of non-primes (incl. SMEs) is required. For additional information please go to:http://www.esa.int/About_Us/Business_with_ESA/Small_and_Medium_Sized_Enterprises/Opportunities_for_SMEs/Procurement_policy_on_fair_access_for_SMEs_-_the_C1-C4_Clauses","ecosrequired":true,"establishment":"ESTEC","firstPublicationDate":"2026-03-18T09:01:25","id":183832,"idEra":24789,"initiatingService":"RNC-FTS","ipmeasure":"C2","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"262","lastUpdateTime":"2026-09-08T11:05:06","lastUpdateUser":"ltena","openDate":"2026-06-17T11:38:05","priceRange":"> 500 KEURO","programmeReference":"IC1 - Advanced Techn","tanumber":"1-13368","title":"STANDARDISED FUNCTIONAL POWER CONTROL MODULES FOR CONSTELLATIONS SATELLITES (ARTES AT 4F.182) - EXPRO+","directorate":"Dir. of Connectivity  Secure Comm.","countries":[{"id":1},{"id":168},{"id":67},{"id":62},{"id":26},{"id":24},{"id":23},{"id":22},{"id":19},{"id":17},{"id":16},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":7},{"id":6},{"id":5},{"id":2},{"id":15},{"id":4}],"products":[{"id":329}],"technologies":[{"id":482}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter."],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 10 of the Cover Letter of the Proposal Template);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.7 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.8 of the EXPRO/TC);","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the ITT;","The Tenderer confirms that the tender is compliant with the budgetary limit applicable to the ITT;","The Cover Letter of the tender indicates the dedicated section of the tender that provides the rationale why the participation of non-LSI companies is considered as significant.","ARTES 4.0 Core Competitiveness Generic Programme Line - Component A: Advanced Technology:\nThe Tenderer confirms that supporting evidence of the authorisation of funding from the relevant Participating State(s) is provided as part of the Tender cover letter and in accordance with the requirements of section 4 of the Cover letter to the present ITT."],"evaluationCriterias":[{"criterion":"Background and experience (related to the particular field concerned) of the company(ies) and staff, including adequacy of the proposed facilities.","weightingFactor":"25%"},{"criterion":"Understanding of the objectives of the activity and discussion of the problem areas, and adequacy of the programme of work","weightingFactor":"60%"},{"criterion":"Adequacy of the time dedication and costing, compliance with administrative tender conditions and acceptance of the contract conditions","weightingFactor":"15%"}],"entities":[],"procurementProposal":null,"responsible":"Nathalie Dorval","updateReason":"Tender Clarification has been published"}],"totalNew":0,"totalUpdated":0}