{"start":0,"take":1,"total":1,"items":[{"activityNumber":"1000045542","budgetReference":"E/0901-01 - Technology Developme","classified":false,"closingDate":"2026-11-23T13:00:00","extensionRequestDeadline":"2026-11-16T13:00:00","clarificationRequestDeadline":"2026-11-16T13:00:00","description":"Objective: To develop a comprehensive set of rigorously tested tools that ensures monitoring, risk assessment, and collision avoidance for close proximity operations.Description: Past activities related to Close Proximity Operations (CPO) highlighted the need ofdeveloping low impact velocity tools that can verify and validate that the servicer spacecraft (SC) maintains a collision risk probability of less than given threshold (e.g 10^-4) with the client SC during CPO. For missions involving multiple SC in close formation, the design of manoeuvres to avoid collisions with catalogue objects not belonging to the formation requires to take into account all SC of the formation, e.g. an avoidance manoeuvre performed by one SC of the formation shall not trigger an inner-formation collision risk but rather minimise disturbance to the formation while ensuring the required risk reduction. This activity aims at developing a comprehensive set of tools (e.g. DRAMA like tool, prototype software for formation flying) that ensure monitoring, risk assessment, and collision avoidance during close proximity operations (including formation flying). This activity encompasses the followingtasks: - Develop and refine software tools that model the trajectory of both the target and servicer. - Develop algorithms that identify safe trajectories for close approaches and include collision avoidance features. - Develop tools that perform uncertainty propagation to estimate the likelihood of a collision between the servicer and client. - Identify sensor systems capable of providing design and operational level data about the relative positions, velocities, and orientations of both the servicer and the target. - Conduct virtual testing within the developed tools to simulate close approach and rendezvous operations in various scenarios. - Develop mathematical models of constraints and requirements and prototype a software solution suitable for realistic scenarios.","ecosrequired":true,"establishment":"ESTEC","firstPublicationDate":"2026-02-05T12:15:11","id":181874,"idEra":24554,"initiatingService":"TEC-QI","ipmeasure":"N/A","isArchived":false,"isCancelled":false,"isReissued":false,"isToBeReissued":false,"issueQuarter":"261","lastUpdateTime":"2026-10-09T10:49:42","lastUpdateUser":"rhamill","openDate":"2026-10-09T10:49:37","priceRange":"200-500 KEURO","programmeReference":"Technology Developme","tanumber":"1-13248","title":"LOW-IMPACT VELOCITY TOOLS FOR VERIFICATION AND VALIDATION OF CLOSE PROXIMITY OPERATIONS STRATEGIES EXPRO+","directorate":"Directorate of Tech, Eng.  Quality","countries":[{"id":1},{"id":168},{"id":67},{"id":27},{"id":26},{"id":25},{"id":24},{"id":23},{"id":22},{"id":19},{"id":16},{"id":17},{"id":13},{"id":12},{"id":11},{"id":10},{"id":9},{"id":8},{"id":7},{"id":6},{"id":5},{"id":2},{"id":15}],"products":[{"id":388},{"id":389}],"technologies":[{"id":209},{"id":237}],"status":{"id":2},"tenderType":{"id":5},"isFavourite":false,"eraVersion":1,"stageNumber":null,"isNew":false,"isUpdated":false,"declarationOfCompliances":["All the required declarations of compliance have been addressed and included in our proposal&#39;s Cover Letter."],"keyAcceptanceFactors":["The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to satisfy the “Eligibility Requirements” (see section 1.1 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to fulfil the requirements concerning “Free Competition” (see paragraph 10 of the Cover Letter of the Proposal Template);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to accept the conditions established for “Non commitment by the Agency in competitive procurements” (see section 1.7 of the EXPRO/TC);","The Tenderer confirms, on its behalf and on behalf of its Subcontractor(s), to be compliant with the “Non Benefits Requirements” (see section 1.8 of the EXPRO/TC);","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a binding price;","The Tenderer confirms that the tender Cover Letter and the Detailed Proposal contain a price type compliant with the one requested in the ITT;","The Tenderer confirms that the tender is compliant with the budgetary limit applicable to the ITT;"],"evaluationCriterias":[{"criterion":"Background and experience (related to the particular field concerned) of the company(ies) and staff, including adequacy of the proposed facilities","weightingFactor":"35%"},{"criterion":"Understanding of the objectives of the activity and discussion of the problem areas, and adequacy of the programme of work","weightingFactor":"50%"},{"criterion":"Adequacy of the time dedication and costing, compliance with administrative tender conditions and acceptance of the contract conditions","weightingFactor":"15%"}],"entities":[],"procurementProposal":null,"responsible":"Maxime Guy","updateReason":"Tender Action Issued"}],"totalNew":0,"totalUpdated":0}